Relationship between procurement duration and project performance in design-build water/wastewater projects

作者: Ruoyu Jin

DOI:

关键词:

摘要:

参考文章(43)
Jeffrey L. Beard, Edward C. Wundram, Michael C. Loulakis, Design-Build: Planning Through Development ,(2000)
Douglas D. Gransberg, James E. Koch, Keith R. Molennar, Preparing for Design-Build Projects: A Primer for Owners, Engineers, and Contractors ,(2006)
Sai-On Cheung, Tsun-Ip Lam, Yue-Wang Wan, Ka-Chi Lam, None, Improving Objectivity in Procurement Selection Journal of Management in Engineering. ,vol. 17, pp. 132- 139 ,(2001) , 10.1061/(ASCE)0742-597X(2001)17:3(132)
Anthony D. Songer, Keith R. Molenaar, PROJECT CHARACTERISTICS FOR SUCCESSFUL PUBLIC-SECTOR DESIGN-BUILD Journal of Construction Engineering and Management-asce. ,vol. 123, pp. 34- 40 ,(1997) , 10.1061/(ASCE)0733-9364(1997)123:1(34)
Mark Konchar, Victor Sanvido, Comparison of U.S. Project Delivery Systems Journal of Construction Engineering and Management-asce. ,vol. 124, pp. 435- 444 ,(1998) , 10.1061/(ASCE)0733-9364(1998)124:6(435)
Douglas D. Gransberg, Sanjaya P. Senadheera, Design-Build Contract Award Methods for Transportation Projects Journal of Transportation Engineering-asce. ,vol. 125, pp. 565- 567 ,(1999) , 10.1061/(ASCE)0733-947X(1999)125:6(565)
Eddie W. Cheng, Heng Li, Paul Fox, Job performance dimensions for improving final project outcomes Journal of Construction Engineering and Management-asce. ,vol. 133, pp. 592- 599 ,(2007) , 10.1061/(ASCE)0733-9364(2007)133:8(592)
James B. Pocock, Liang Y. Liu, Wilson H. Tang, Prediction of Project Performance Based on Degree of Interaction Journal of Management in Engineering. ,vol. 13, pp. 63- 76 ,(1997) , 10.1061/(ASCE)0742-597X(1997)13:2(63)
Edmond W. Lam, Albert P. Chan, Daniel W. Chan, Determinants of Successful Design-Build Projects Journal of Construction Engineering and Management-asce. ,vol. 134, pp. 333- 341 ,(2008) , 10.1061/(ASCE)0733-9364(2008)134:5(333)