Optimization Modeling and Analysis of Truck Allocation System in Surface Mining Operations

作者: Hao Wen

DOI:

关键词:

摘要:

参考文章(41)
G.H. Huang, N. Sae-Lim, L. Liu, Z. Chen, An Interval-Parameter Fuzzy-Stochastic Programming Approach for Municipal Solid Waste Management and Planning Environmental Modeling & Assessment. ,vol. 6, pp. 271- 283 ,(2001) , 10.1023/A:1013394118863
Rüdiger Schultz, Stochastic programming with integer variables Mathematical Programming. ,vol. 97, pp. 285- 309 ,(2003) , 10.1007/S10107-003-0445-Z
Christian Niemann-Delius, Javad Sattarvand, Long-term open-pit planning by ant colony optimization Mainz. ,(2012)
Xiaowei Pan, OPTIMIZATION OF MINERAL PROCESSING PLANT THROUGH ROM ORE SIZE AGH Journal of Mining and Geoengineering. ,vol. 36, pp. 123- 132 ,(2012)
Louis Caccetta, Stephen P. Hill, An Application of Branch and Cut to Open Pit Mine Scheduling Journal of Global Optimization. ,vol. 27, pp. 349- 365 ,(2003) , 10.1023/A:1024835022186
John R. Sturgul, Zhongxue Li, New developments in simulation technology and applications in the minerals industry International Journal of Surface Mining, Reclamation and Environment. ,vol. 11, pp. 159- 162 ,(1997) , 10.1080/09208119708944087
J W Chinneck, K Ramadan, Linear programming with interval coefficients Journal of the Operational Research Society. ,vol. 51, pp. 209- 220 ,(2000) , 10.1057/PALGRAVE.JORS.2600891
GUOHE HUANG, BRIAN W. BAETZ, GILLES G. PATRY, A GREY LINEAR PROGRAMMING APPROACH FOR MUNICIPAL SOLID WASTE MANAGEMENT PLANNING UNDER UNCERTAINTY Civil Engineering Systems. ,vol. 10, pp. 123- 146 ,(1992) , 10.1080/02630259208970657