Operating strategies to maximise gold recovery at Telfer

作者: X. Zheng , P. Manton , F. Burns , A. Crawford , P. Griffin

DOI: 10.1016/J.MINENG.2010.03.014

关键词:

摘要: On average, the difference in recovery between copper and gold is 15% among large scale copper/gold operations. At Telfer, a number of operating strategies have been implemented together with sequential flotation circuit design to maximise recovery. The main include targeting primary grind size optimum for recovery, designing as pyrite flotation, minimum saleable concentrate grade, allowing portion pyrite/gold recovered into leaching extract gold. These lifted both above 90%. There are opportunities further improve metallurgical performance at including single stage cleaning rougher concentrate, regrinding scavenger prior followed by additional leaching.

参考文章(6)
J.R. Gardner, R. Woods, An electrochemical investigation of the natural flotability of chalcopyrite International Journal of Mineral Processing. ,vol. 6, pp. 1- 16 ,(1979) , 10.1016/0301-7516(79)90028-0
E. Ahlberg, K. S. E. Forssberg, X. Wang, The surface oxidation of pyrite in alkaline solution Journal of Applied Electrochemistry. ,vol. 20, pp. 1033- 1039 ,(1990) , 10.1007/BF01019585
N.D. Janetski, S.I. Woodburn, R. Woods, An electrochemical investigation of pyrite flotation and depression International Journal of Mineral Processing. ,vol. 4, pp. 227- 239 ,(1977) , 10.1016/0301-7516(77)90004-7
C. Bazin, R. Grant, M. Cooper, R. Tessier, A method to predict metallurgical performances as a function of fineness of grind Minerals Engineering. ,vol. 7, pp. 1243- 1251 ,(1994) , 10.1016/0892-6875(94)90115-5
G.W. Heyes, W.J. Trahar, The natural flotability of chalcopyrite International Journal of Mineral Processing. ,vol. 4, pp. 317- 344 ,(1977) , 10.1016/0301-7516(77)90012-6
Kym Cheri Runge, M. Ijsselstijn, A. Vien, J. McMaster, Establishing the relationship between grind size and flotation recovery using modelling techniques. Flotation 2007. ,(2007)