作者: Xinji Xu , Qingsong Zhang , Bin Liu , Lei Chen , Lei Chen
DOI: 10.1007/S10064-020-02088-Z
关键词:
摘要: Forward prospecting to predict the location of high-risk geological zones during tunnel boring machine (TBM) tunneling is important for safe and efficient tunnel construction. Seismic forward-prospecting methods are sensitive to geological structures and have been widely used in areas with relatively well-developed structures, such as mountainous areas with active tectonics. The Gaoligongshan Tunnel in Yunnan, China, with an advance pilot tunnel, was chosen for this study. The advantages of seismic while tunneling and active …