作者: R.G. deAlmeida , E.D. Castronuovo , J.A. PecasLopes
DOI: 10.1109/TPWRS.2005.861996
关键词:
摘要: This paper proposes an optimized dispatch control strategy for active and reactive powers delivered by a doubly fed induction generator in wind park. In this approach, turbines are supposed to operate over deloaded maximum power extraction curve will respond supervisory farm after request from system operator adjusting the outputs of The definition operating points, each turbine, is defined optimization algorithm that uses primal-dual predictor corrector interior point method. used at level exploits combination pitch static converters adjust rotor speed required operation points. A small park illustrate effectiveness developed approach.