Risk-averse supply chain for modular construction projects

作者: Pei-Yuan Hsu , Marco Aurisicchio , Panagiotis Angeloudis

DOI: 10.1016/J.AUTCON.2019.102898

关键词:

摘要: Abstract The traditional in-situ construction method is currently being replaced by modular building systems, that take advantage of modern manufacturing, transportation, and assembly methods. This transformation poses a challenge to supply chains, which have, thus far, been concentrated on raw material transportation only. A mathematical model conceived in this study for the design optimisation risk-averse logistics configurations projects under operational uncertainty. considers storage, stages, along with selection optimal warehouse locations. Using robust optimisation, accounts common causes schedule deviations sites, including inclement weather, late deliveries, labour productivity fluctuations crane malfunctions. school dormitory project used as case study, demonstrating proposed outperforms existing techniques settings multiple sources

参考文章(52)
Houssem Felfel, Omar Ayadi, Faouzi Masmoudi, A Multi-site Supply Chain Planning Using Multi-stage Stochastic Programming Conference on Multiphysics Modelling and Simulation for Systems Design. pp. 289- 298 ,(2014) , 10.1007/978-3-319-14532-7_30
Manuel Díaz-Madroñero, David Peidro, Josefa Mula, A review of tactical optimization models for integrated production and transport routing planning decisions Computers & Industrial Engineering. ,vol. 88, pp. 518- 535 ,(2015) , 10.1016/J.CIE.2015.06.010
Yossiri Adulyasak, Patrick Jaillet, Models and Algorithms for Stochastic and Robust Vehicle Routing with Deadlines Transportation Science. ,vol. 50, pp. 608- 626 ,(2016) , 10.1287/TRSC.2014.0581
Hong Xian Li, Mohamed Al-Hussein, Zhen Lei, Ziad Ajweh, Risk identification and assessment of modular construction utilizing fuzzy analytic hierarchy process (AHP) and simulation Canadian Journal of Civil Engineering. ,vol. 40, pp. 1184- 1195 ,(2013) , 10.1139/CJCE-2013-0013
Sadi A. Assaf, Sadiq Al-Hejji, Causes of delay in large construction projects International Journal of Project Management. ,vol. 24, pp. 349- 357 ,(2006) , 10.1016/J.IJPROMAN.2005.11.010
Leandro C. Coelho, Gilbert Laporte, Optimal joint replenishment, delivery and inventory management policies for perishable products Computers & Operations Research. ,vol. 47, pp. 42- 52 ,(2014) , 10.1016/J.COR.2014.01.013
Stephen C. H. Leung *, Yue Wu, A robust optimization model for stochastic aggregate production planning Production Planning & Control. ,vol. 15, pp. 502- 514 ,(2004) , 10.1080/09537280410001724287
Marianthi G. Ierapetritou, Efstratios N. Pistikopoulos, Batch Plant Design and Operations under Uncertainty Industrial & Engineering Chemistry Research. ,vol. 35, pp. 772- 787 ,(1996) , 10.1021/IE950263F
Younes Guessous, Maurice Aron, Neila Bhouri, Simon Cohen, Estimating Travel Time Distribution under different Traffic conditions Transportation research procedia. ,vol. 3, pp. 339- 348 ,(2014) , 10.1016/J.TRPRO.2014.10.014
A.A. Elimam, B. Dodin, Project scheduling in optimizing integrated supply chain operations European Journal of Operational Research. ,vol. 224, pp. 530- 541 ,(2013) , 10.1016/J.EJOR.2012.09.007