作者: Pei-Yuan Hsu , Marco Aurisicchio , Panagiotis Angeloudis
DOI: 10.1016/J.AUTCON.2019.102898
关键词:
摘要: Abstract The traditional in-situ construction method is currently being replaced by modular building systems, that take advantage of modern manufacturing, transportation, and assembly methods. This transformation poses a challenge to supply chains, which have, thus far, been concentrated on raw material transportation only. A mathematical model conceived in this study for the design optimisation risk-averse logistics configurations projects under operational uncertainty. considers storage, stages, along with selection optimal warehouse locations. Using robust optimisation, accounts common causes schedule deviations sites, including inclement weather, late deliveries, labour productivity fluctuations crane malfunctions. school dormitory project used as case study, demonstrating proposed outperforms existing techniques settings multiple sources