作者: Xuan Zhang , Antonio J. Conejo
DOI: 10.1109/TPWRS.2018.2842045
关键词:
摘要: In this paper, the coordinated investment in transmission and storage systems under uncertainty is addressed from perspective of a central planner. The problem formulated with objective achieving an effective expansion both that minimizes cost, while operation power system high penetration renewable power. stated within adaptive robust optimization framework incorporates stochastic modeling. Future available generation capacity peak load target year (long-term uncertainty) are modeled using set, daily operating conditions (short-term represented scenario set. tradeoff between analyzed IEEE RTS 24-bus 118-bus networks.