Floating offshore facility and method for supplying electric power in floating offshore facility

作者: Teramoto Yusei , Shibata Shigeyuki

DOI:

关键词:

摘要: This floating offshore facility (1) is configured such that: the propulsion system for moving by an electric (20) which uses motors (22a and 22b) to drive a propeller (21); first group of generators (11a, 11b, 12a, 12b) arranged on upper deck (3), while second (13a 13b) in engine room (5); power running production equipment (30) supplied both groups, driving group. configuration significantly reduces space taken up (5) where system, used when navigating site installation but otherwise unnecessary operation sea, arranged, thereby increases that can be hold (6) storage.

参考文章(5)
Ernst-Christoph Krackhardt, Hans Bernhard Müller-Schwenn, Buoyant harbor power supply ,(2008)
Brandon T. Stone, Eric D. Nelson, Kevin N. Stanley, Ronald R. Bowen, Lng Transportation Vessel and Method For Transporting Hydrocarbons ,(2005)
Shinya Yuasa, 伸哉 湯浅, Ship and processing method for combustible gas in ship ,(2009)
Weiming Miao, Electric propulsion ship ,(2011)