作者: Ihor Blinov , Ievgev O Zaitsev , Vladislav V Kuchanskyy , None
DOI: 10.1007/978-3-030-48583-2_8
关键词:
摘要: The problems of capacity allocation cross-border transmissions for electricity market coupling are considered. Ways to improve transmission efficiency in 330–750 kV bulk electrical power networks is reduced due the technological losses elements. main load elements network and on corona wires overhead lines. It proposed control real time crown air Power significantly dependent weather conditions voltage level network. A slight decrease grid during rain when deposited frost will reduce loss energy extra-voltage aim work based project “Energy Bridge” Ukraine—“European Union”, which envisages launch Ukraine 750 lines “Khmelnitsky NPP—Rzeszow” “South Ukrainian NPP-Isakcha”. Improving reliability interconnection ensure creation Ukraine’s independence by expanding use its potential throughput grid, fulfilling tasks development.