Multi-criteria Approach for Prioritizing Bridge Maintenance in Developing Country (Case Study of Bali Province, Indonesia)

作者: Putu Alit Suthanaya , Ida Bagus Artamana

DOI: 10.24203/AJAS.V5I2.4688

关键词:

摘要: Transport agencies in developing countries are often faced by the need to maintain a lot of road projects but have limited budget. One important infrastructure complement is bridge. The bridge vital facilities for continuing development social and economic activities region. A serious problem such as Indonesia funds available maintenance. In Bali Province, priority maintenance program prepared based only on technical condition However, many aspects actually be considered. As available, objective this study develop prioritization criteria rank bridges maintained Analytic Hierarchy Process (AHP) method using Province case study. It was found that stakeholders gave network system 1.34 times more than movement system, 1.56 land use 2.49 institutional system. identified main factor considered maintaining Province. From 86 study, it 19 were very high category. also ranking AHP similar realized program.

参考文章(1)
Hsi-Hsien Wei, Feniosky A. Peña-Mora, Vahid Balali, Muqing Liu, Scenario-based Multi-criteria Prioritization Framework for Urban Transportation Projects American Journal of Civil Engineering and Architecture. ,vol. 3, pp. 193- 199 ,(2015) , 10.12691/AJCEA-3-6-1