ARAMIS Project: An Integrated Risk Assessment Methodology that Answers the Needs of Various Stakeholders

作者: Bruno Debray , Olivier Salvi

DOI: 10.2495/SAFE050271

关键词:

摘要: The ARAMIS European project started in January 2002. Its overall objective was to build up a new Accidental Risk Assessment Methodology for Industries that combined the strengths of both deterministic and risk-based approaches. It co-funded under 5th EC Framework Program involved 15 partners 10 countries. Three years after, is reached methodology ready be used. paper intends give very general description t and, above all, show how it answers needs various stakeholders concerned by safety industrial plants. divided into six major steps, which will described shortly this paper. They are detailed several papers presented same SAFE 2005 conference main project. potential end users mainly industry, competent authorities local authorities. If all them have an interest risk management process, their slightly different. Their expectations way brings answer explained

参考文章(3)
A. Pipart, C. Fievez, Emmanuel Hubert, Bruno Debray, Henry Londiche, C. Delvosalle, Aramis project : effect of safety systems on the definition of reference accident scenarios in Seveso establishments 11eme International Symposium Loss Prevention 2004. ,(2004)
Christian Kirchsteiger, On the use of probabilistic and deterministic methods in risk analysis Journal of Loss Prevention in The Process Industries. ,vol. 12, pp. 399- 419 ,(1999) , 10.1016/S0950-4230(99)00012-1
Igor Kozine, F. Markert, A. Amendola, K. Lauridsen, M. Christou, ASSURANCE: Assessment of uncertainties in risk analysis of chemical establishments 5th International Conference on Probabilistic Safety Assessment and Management. pp. 369- 374 ,(2000)