A review of supply chain management issues in Malaysian industrialised building system (IBS) construction industry

作者: Angela Lee , Mohd Faizal Omar , Mohd Nasrun Mohd Nawi

DOI:

关键词:

摘要: The construction industry is a complex and dynamic industrial sector. Malaysia, as developing country, considers the one main contributor of country‟s Gross Domestic Product (GDP). Due to combination problems issues that have recently arisen in current methods, such time delay, rising costs raw materials, lack communication coordination, inefficient management, many other problems, government has come out with new solution through an industrialisation technology called Industrialised Building System (IBS). However, after five years implementation Malaysian construction industry, acceptance level IBS still below expectation. Supply chain management (SCM) very much covered more glamorous sectors electronics manufacturing, potential for improving solving these problems. In-line investigating this effort, research paper aims provide alternative solutions addressing A survey application SCM fits needs be performed. This hopes answer help toward betterment order enhance industry.

参考文章(10)
Anders Ekholm, Lars Stehn, Jerker Lessing, Industrialised housing –definition and categorization of the concept Annual conference of the International Group for Lean Construction : 18/07/2005 - 21/07/2005. pp. 471- 480 ,(2005)
Keah Choon Tan, Steven B. Lyman, Joel D. Wisner, Supply chain management: a strategic perspective International Journal of Operations & Production Management. ,vol. 22, pp. 614- 631 ,(2002) , 10.1108/01443570210427659
Angela Clarke, A practical use of key success factors to improve the effectiveness of project management International Journal of Project Management. ,vol. 17, pp. 139- 145 ,(1999) , 10.1016/S0263-7863(98)00031-3
Zulkifli Mohamed Udin, Mohammad K. Khan, Mohamed Zairi, A collaborative supply chain management: Part 2 – the hybrid KB/gap analysis system for planning stage Business Process Management Journal. ,vol. 12, pp. 671- 687 ,(2006) , 10.1108/14637150610691064
Jacob Oluwoye, Lynn Crawford, Yaw Frimpong, Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study International Journal of Project Management. ,vol. 21, pp. 321- 326 ,(2003) , 10.1016/S0263-7863(02)00055-8
John T. Mentzer, William DeWitt, James S. Keebler, Soonhong Min, Nancy W. Nix, Carlo D. Smith, Zach G. Zacharia, DEFINING SUPPLY CHAIN MANAGEMENT Journal of Business Logistics. ,vol. 22, pp. 1- 25 ,(2001) , 10.1002/J.2158-1592.2001.TB00001.X
Herman Shah Anuar, Angela Lee, Mohd Nasrun Mohd Nawi, A Review of IBS Malaysian Current and Future Study International journal of engineering research and technology. ,vol. 2, ,(2013)
H. Abdul-Rahman, M. A. Berawi, A. R. Berawi, O. Mohamed, M. Othman, I. A. Yahya, Delay Mitigation in the Malaysian Construction Industry Journal of Construction Engineering and Management-asce. ,vol. 132, pp. 125- 133 ,(2006) , 10.1061/(ASCE)0733-9364(2006)132:2(125)
D. N. Trikha, Abang Abdullah Abang Ali, Industrialised building systems Universiti Putra Malaysia Press. ,(2004)