Method of large scale process optimization and optimal planning based on real time dynamic simulation

作者: Ilya Markevich , Dmitriy Khots , Vadim Shapiro

DOI:

关键词:

摘要: This invention provides a system and method of Advanced Process Control for optimal operation multi-unit plants in large scale processing power generation industries. The framework includes the following components: continuous real time dynamic process simulation, automatic coefficient adjustment static models, construction transfer functions, determination globally operating point specific to current conditions, provision additional scenarios through variety unit combinations, calculation operational forecasts accordance with planned production.

参考文章(34)
Kadir Liano, Willie Putrajaya, Chih-An Hwang, Yong-Zai Lu, Carl Schweiger, Polymer production scheduling using transition models ,(2003)
Daniel Y. Abramovitch, Carl P. Taussig, Determination of open loop responses from closed loop measurements ,(1992)
John P. Havener, Stephen Piche, Mark Gerules, Eugene Boe, Gregory D. Martin, Douglas Timmer, James David Keeler, Method and apparatus for dynamic and steady state modeling over a desired path between two end points ,(1997)
Wilhelm K Wojsznis, Peter Wojsznis, Terrence Lynn Blevins, Mark J Nixon, Multi-objective predictive process optimization with concurrent process simulation ,(2006)
Joseph Leonard Peczkowski, Nonlinear multivariable control system ,(1989)
Louis R. Grobmyer, Albert J. Impink, Robert E. Sariscak, Toshio Morita, John L. Duryea, Reactor core model update system ,(1989)
Louis Richard Grobmyer, Jr Albert Joseph Impink, Reno Wade Miller, Toshio Morita, Calibration of a nuclear reactor core parameter predictor ,(1987)