作者: M. Asghari , M. Noaparast , S. Z. Shafaie , S. Ghassa , S. Chehreh Chelgani
DOI: 10.1007/S40789-018-0197-2
关键词:
摘要: Considerable amounts of coal particles are accumulated in the tailing dams washing plants which can make serious environmental problems. Recovery these from tailings has economically and environmentally several advantages. Maintaining natural resources reducing discharges to most important ones. This study was examined possibility recover a dam with 56.29% ash content by using series processing techniques. For this purpose, gravity separation (jig, shaking table spiral) flotation tests were conducted upgrade products. Based optimum value methods, flowsheet designed increase rate recovery for wide range particles. Results indicated that circuit over 90% reduce product less than 14%. These results potentially be used designing an industrial operation as recycling plant appropriate instance other areas issues dams.