Performance Evaluation of Surface Mining Equipment with Particular Reference to Shovel-Dumper Mining

作者: Shailesh Kumar Sone

DOI:

关键词:

摘要: Surface mining is the most well-known around world, and open pit accounts for more than 60% of all surface yield. Haulage costs represent as much aggregate working expense these type mines, so it desirable to keep up an effective haulage framework. Equipment availability estimation utilization very precisely which important since mine manager wants utilize their equipment effectively possible get early return investment well reducing total production cost. In present situation achieve high productivity HEMMs in opencast desired have % besides ensure overall effectiveness per CMPDI norms/global bench marks. OEE shows that how utilized with its maximum effectiveness. It uses parameters like availability, performance One method use haul cycle queuing theory. Queuing theory was developed model systems provide service randomly arising demands predict behaviour such systems. A system one customers arrive service, wait if not immediately available, move on next server or exit once they been serviced. Most routes consist four main components: loading, loaded hauling, dumping, unloaded hauling loader. These components can be modelled together servers cyclic network, independently individual channels. Data from a large are analysed applied multichannel representative loading process cycle. The outputs compared against actual dumper data evaluate validity developed.

参考文章(17)
S. Suresh Kumar, AHP-based formal system for R&D project evaluation Journal of Scientific & Industrial Research. ,vol. 63, pp. 888- 896 ,(2004)
Walter C. Giffin, Queueing : basic theory and applications Grid. ,(1978)
Jacek Paraszczak, Understanding and assessment of mining equipment effectiveness Mining Technology. ,vol. 114, pp. 147- 151 ,(2005) , 10.1179/037178405X53971
Christina N. Burt, Lou Caccetta, Equipment Selection for Surface Mining: A Review Interfaces. ,vol. 44, pp. 143- 162 ,(2014) , 10.1287/INTE.2013.0732
Bimal Samanta, B. Sarkar, S. K. Mukherjee, Selection of opencast mining equipment by a multi-criteria decision-making process Mining Technology. ,vol. 111, pp. 136- 142 ,(2002) , 10.1179/MNT.2002.111.2.136
M. J. Maher, J. G. Cabrera, The Transient Behaviour of a Cyclic Queue Journal of the Operational Research Society. ,vol. 24, pp. 603- 613 ,(1973) , 10.1057/JORS.1973.109
Amol Lanke, Behzad Ghodrati, Hadi Hoseinie, Mine Production Index (MPI): New Method to Evaluate Effectiveness of Mining Machinery World Academy of Science, Engineering and Technology, International Journal of Environmental, Chemical, Ecological, Geological and Geophysical Engineering. ,vol. 8, pp. 755- 759 ,(2014)