作者: M.A. Redfern , O. Usta , G. Fielding
DOI: 10.1109/61.252622
关键词:
摘要: The requirements of an islanding, or 'loss grid', protection for a dispersed storage and generation unit are examined, the principal methods used this type relaying outlined. A new algorithm is introduced which based on rate change power as measured at generator's terminals. responses different measurands examined selection system operating conditions in order to demonstrate operation protection. shown trip loss grid load fluctuations while independently utility supply following grid, out-of-synchronism reconnection unit. It also remain stable major remains connected generator system. >