作者: Zahra Sadat Moussavi Nadoushani , Ahmed W. A. Hammad , Ali Akbarnezhad
DOI: 10.1061/(ASCE)CO.1943-7862.0001215
关键词:
摘要: AbstractThe choice of a suitable tower crane along with its location may considerably affect the costs and duration construction process. The determines travel time transporting material between supply demand points thus operation costs. On other hand, distance as well affects minimum required load moment capacity cranes cranes’ rental operating Previous studies on optimizing site have focused mainly minimizing through their time, overlooking effect This paper presents modified optimization model that also accounts for effects capacity, top t...