Key Factors Affecting Construction Organizations' Acceptance of BIM: A Comparative Study

Ying Hong , Samad M.E. Sepasgozar , Akbarnezhad Ali
Modular and Offsite Construction (MOC) Summit Proceedings

2016
Experimental and theoretical investigation of long-term performance of steel-timber composite beams

AA Chiniforush , HR Valipour , MA Bradford , A Akbar Nezhad
Engineering Structures 249 113314 -113314

16
2021
Performance of low calcium fly ash geopolymer concrete with steel furnace slag coarse aggregate

A Castel , A Akbar Nezhad , S Foster , M Smith
24th Australasian Conference on the Mechanics of Structures and Materials, 1847 -1851

2016
Active steel corrosion in blended slag and fly ash geopolymer concrete.

M. BABAEE , A. CASTEL , AKBARNEZHAD
34th Cement and Concrete Science Conference, 14-17 September 2014, University of Sheffield.

6
2014
Construction project delivery: Practices, challenges, and opportunities

Assed N Haddad , Carlos AP Soares , Ali A Nezhad , João CG Lanzinha
Frontiers in Built Environment 8 989798 -989798

2022
Computational Methods for Estimation of Life Cycle Carbon Footprint of Buildings

Nadoushani Zahra , Moussavi , Ali , Akbarnezhad
NOVA Science Publishing; ISBN: 978-1-63463-244-7

2014
Seismic Behaviour of RBS and AW-RBS Moment Resistant Connections in Double I-Beams

Ebrahimzadeh Sepasgozar SM , Naghipour M , A , Akbarnezhad
Applied Mechanics and Materials 553 612 -617

2014
Designed for Disassembly for Sustainable Precast Construction

Chandra LR , Ong KCG , Akbarnezhad A , Tam CT
International Seminar of Concrete Technology, Semarang, Indonesia

2013
Recycled Concrete Aggregates – The Microwave Beneficiation Option

Foo TWJ Ong KCG , Akbarnezhad A , Zhang MH , Tam CT
The Professor LEE SENG LIP Symposium, 21-22 March 2011, Singapore

2011
A novel real-time detailed feedback collection and interaction tool for large classes

Ali Akbarnezhad , Taha H Rashidi , Alireza Ahmadian Fard Fini
27th Annual Conference of the Australasian Association for Engineering Education : AAEE 2016 1

2016
Accounting for Transport Times in Planning Off-Site Shipment of Construction Materials

F. F. Alireza Ahmadian , Ali Akbarnezhad , Taha H. Rashidi , S. Travis Waller
Journal of Construction Engineering and Management 142 ( 1) 04015050

34
2016
Incorporating Multiskilling and Learning in the Optimization of Crew Composition

Alireza Ahmadian Fard Fini , Taha H. Rashidi , Ali Akbarnezhad , S. Travis Waller
Journal of Construction Engineering and Management 142 ( 5) 04015106 -04015106

21
2016
A Computational Method for Estimating Travel Frequencies in Site Layout Planning

Ahmed W. A. Hammad , Ali Akbarnezhad , David Rey , S. Travis Waller
Journal of Construction Engineering and Management 142 ( 5) 04015102 -04015102

21
2016
Location Optimization of Tower Crane and Allocation of Material Supply Points in a Construction Site Considering Operating and Rental Costs

Zahra Sadat Moussavi Nadoushani , Ahmed W. A. Hammad , Ali Akbarnezhad
Journal of Construction Engineering and Management 143 ( 1) 04016089

18
2017
Job Assignment Based on Brain Demands and Human Resource Strategies

Alireza Ahmadian Fard Fini , Ali Akbarnezhad , Taha H. Rashidi , S. Travis Waller
Journal of Construction Engineering and Management 143 ( 5) 04016123

2
2017
Dynamic Programming Approach toward Optimization of Workforce Planning Decisions

Alireza Ahmadian Fard Fini , Ali Akbarnezhad , Taha H. Rashidi , S. Travis Waller
Journal of Construction Engineering and Management 144 ( 2) 04017113

19
2018
Analysis of Citation Networks in Building Information Modeling Research

M. Reza Hosseini , Mojtaba Maghrebi , Ali Akbarnezhad , Igor Martek
Journal of Construction Engineering and Management 144 ( 8) 04018064

122
2018
Optimization of Job Allocation in Construction Organizations to Maximize Workers’ Career Development Opportunities

Babak Shahbazi , Ali Akbarnezhad , David Rey , Alireza Ahmadian Fard Fini
Journal of Construction Engineering and Management 145 ( 6) 04019036

21
2019