作者: L Bayón , JM Grau , MM Ruiz , PM Suárez , None
DOI: 10.1016/J.MCM.2012.03.007
关键词:
摘要: Abstract The new Spanish regulations allow wind farms to go the market sell energy generated by their facilities. In case of over- or under-supply, other producers must reduce increase production resolve so-called deviation, thereby incurring financial losses. Faced with this situation, have several options. paper we consider one promising method: combined optimization a pumped-storage hydro-plant and park. First, are going present mathematical modelling resulting problem. Second, shall solve problem using Optimal Control techniques finally examples analyse which strategy is best possible.