作者: Anula Abeygunawardana , Ali Arefi , Gerard Ledwich
DOI: 10.1109/PESGM.2014.6939812
关键词:
摘要: Electric distribution networks are now in the era of transition from passive to active with integration energy storage devices. Optimal usage batteries and voltage control devices along other upgrades network needs a expansion planning (DEP) considering inter-temporal dependencies stages. This paper presents an efficient approach for solving multi-stage problems (MSDEPP) based on forward-backward such as regulators capacitors. The proposed algorithm is compared three techniques including full dynamic, forward fill-in, backward pull-out point view their precision computational efficiency. simulation results IEEE 13 bus show pseudo-dynamic good efficiency time optimization.