The effect of manufacturing response time on mitigating the demand risk and facility disruption

作者: I. Niroomand , M.B. Baygi , O. Kuzgunkaya , A.A. Bulgak

DOI: 10.1007/978-3-642-23860-4_89

关键词:

摘要: Nowadays, supply chains are exposed to various risks such as natural disasters and demand uncertainty which cause the flow of materials information be disrupted. The objective this paper is investigate role Reconfigurable Manufacturing System (RMS) responsiveness in harnessing chain disruptions changes demand. We consider a two echelon consisting production warehouse stage. A multi period mixed integer programming tool developed generate configurations defining capacities inventory levels for predetermined planning horizon. resulting configuration then simulated with subject random disruption scenarios need capacity increase. performance different compared identify design strategies. results show that there an optimum mix RMS Dedicated (DMS) minimizes total system costs. Allocating small portion effective way handling disruptions.

参考文章(11)
Sunil Chopra, Man Mohan S. Sodhi, Managing Risk To Avoid Supply-Chain Breakdown MIT Sloan Management Review. ,vol. 46, pp. 53- 61 ,(2004)
M. G. Mehrabi, A. G. Ulsoy, Y. Koren, Reconfigurable manufacturing systems: Key to future manufacturing Journal of Intelligent Manufacturing. ,vol. 11, pp. 403- 419 ,(2000) , 10.1023/A:1008930403506
Christopher S. Tang, Robust strategies for mitigating supply chain disruptions International Journal of Logistics-research and Applications. ,vol. 9, pp. 33- 45 ,(2006) , 10.1080/13675560500405584
Ahmed M. Deif, Hoda A. ElMaraghy, Assessing capacity scalability policies in RMS using system dynamics International Journal of Flexible Manufacturing Systems. ,vol. 19, pp. 128- 150 ,(2007) , 10.1007/S10696-008-9031-2
Y. Koren, U. Heisel, F. Jovane, T. Moriwaki, G. Pritschow, G. Ulsoy, H. Van Brussel, Reconfigurable Manufacturing Systems CIRP Annals. ,vol. 48, pp. 527- 540 ,(1999) , 10.1016/S0007-8506(07)63232-6
Amanda J. Schmitt, Mahender Singh, Quantifying supply chain disruption risk using Monte Carlo and discrete-event simulation winter simulation conference. pp. 1237- 1248 ,(2009) , 10.5555/1995456.1995627
Feryal Erhun, Léa A. Deleris, Risk management in supply networks using monte-carlo simulation winter simulation conference. pp. 1643- 1649 ,(2005) , 10.5555/1162708.1162994
Izak Duenyas, John R. Birge, Wichai Narongwanich, Optimal Portfolio of Reconfigurable and Dedicated Capacity under Uncertainty ,(2002)