作者: Reza Hemmati , Rahmat-Allah Hooshmand , Amin Khodabakhshian
DOI: 10.1016/J.RENENE.2015.07.019
关键词:
摘要: Abstract This paper deals with a coordinated generation expansion planning (GEP)–transmission (TEP) in competitive electricity market. In the proposed method, GEP and TEP are performed at same time, consideration of wind farm uncertainty. The uncertainty is modeled by normal probability distribution function (PDF) Monte-Carlo simulation (MCS) used to include into problem. managed for two master slave levels. At level, all company (GENCO) transmission (TRANSCO) maximize their profit then system constraints checked independent operator (ISO). other words, aims maximizing expected GENCOs TRANSCOs, while considering security reliability such as reserve margin loss load expectation (LOLE). problem constrained, nonlinear, mixed-integer optimization programming solved using particle swarm (PSO) method. Simulation results verify effectiveness validity TRANSCOs presence under