An expert system for forming quadrilateral finite elements

Y.C. Liu , H.A. ElMaraghy , K.F. Zhang
Engineering Computations 7 ( 3) 249 -257

16
1990
The use of batch sizing to improve flow and waiting times in FMS

A.K. Jain , H.A. ElMaraghy
Proceedings of the Fourth International Conference on Computer Integrated Manufacturing and Automation Technology 403 -409

1994
Product Modelling

F.-L. Krause , F. Kimura , T. Kjellberg , S.C.-Y. Lu
CIRP Annals - Manufacturing Technology 42 ( 2) 695 -706

437
1993
ROUGH MACHINING FOR MULTI-SCULPTURED SURFACES

A. Vafaeesefat , H.A. EIMaraghy
Transactions of The Canadian Society for Mechanical Engineering 23 ( 2) 275 -286

1999
Kinematic and geometric modelling and animation of robots

H A ElMaraghy
graphics interface 15 -19

6
1986
Optimal workpiece orientations for machining of sculptured surfaces

A Vafaeesefat , H A ElMaraghy
Proceedings of the Institution of Mechanical Engineers. Part B. Journal of engineering manufacture 214 ( 8) 671 -681

5
2000
Towards a less conservative analysis of geometric tolerances

A O Nassef , H A ElMaraghy
Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 215 ( 1) 37 -45

2001
Rough pocketing of multi-sculptured surface cavities

A Vafaeesefat , H A ElMaraghy
Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 215 ( 6) 745 -753

6
2001
PRODUCTION SCHEDULING/RESCHEDULING IN FLEXIBLE MANUFACTURING

A. K. Jain , H.A. Elmaraghy
International Journal of Production Research 35 ( 1) 281 -309

155
1997
Rapid product design and manufacturing

W.H. Elmaraghy , H.A. Elmaraghy
Current Advances in Mechanical Design and Production VI#R##N#Proceedings of The Sixth Cairo University International MDP Conference, Cairo, 2–4 January 1996 495 -510

1995
A Concurrent Engineering Approach To Robust Product Design

M.H. Gadallah , H.A. Elmaraghy
Concurrent Engineering 1 ( 4) 237 -251

5
1993
Robocell: A computer-aided robots modelling and workstation layout system

H. A. El Maraghy , L. Hamid , W. H. El Maraghy
The International Journal of Advanced Manufacturing Technology 2 ( 2) 43 -59

6
1987
Task space decomposition for invariant control of constrained robots

KrzysztofP. Jankowski , HodaA. Elmaraghy
Journal of Intelligent and Robotic Systems 16 ( 3) 209 -227

2
1996
BONDGRAPH MODELLING OF ROBOT DYNAMICS

W.H. El MARAGHY , H.A. El MARAGHY , A. IBRAHIM
Transactions of The Canadian Society for Mechanical Engineering 13 ( 4) 123 -132

1989
A 2-D Mapping Approach for Monitoring and Diagnosing the Execution of Robotic Assembly Tasks

H.A. El-Maraghy , A. Syed , H. Chu , W.H. El-Maraghy
Cirp Annals-manufacturing Technology 42 ( 1) 9 -12

8
1993
Index of Authors to Volume 25

Chr Angeli , Muhammad Arif , R Barea , L Boquete
Journal of Intelligent and Robotic Systems 25 ( 387) 387 -387

1999
Computer-aided process planning

Hoda A ElMaraghy , Aydin Nassehi
Springer Berlin Heidelberg 339 -345

13
2019
Assembly system design and operations for product variety

S Jack Hu , Jeonghan Ko , Lars Weyand , Hoda A ElMaraghy
CIRP Annals 60 ( 2) 715 -733

614
2011