作者: Jun-xian Shi , Rui Miao , Hui-ting Su , Xi-yao Gu
DOI: 10.2991/978-94-6239-180-2_81
关键词: Layout planning 、 Manufacturing engineering 、 Production cycle 、 Lean manufacturing 、 Cost reduction 、 Assembly line 、 Computer science
摘要: According to facilities layout has significant influence on reduction of process waste, increasing production flexibility and improvement productivity, optimization current assembly line in company B seems under such a circumstance. Based the concrete analysis existing line, two points, operation balance flexibility, were raised up. After systematically analyzing, lean designing, cycle time optimizing, flow oriented planning before-after result tracking comparing, final target was achieved according expectation. The investigation proved that design, balancing are meaningful productivity increasing, stock cost reduction.