Managing the Competencies of Team Members in Design Projects through Multi-period Task Assignment

作者: Onanong Hlaoittinun , Eric Bonjour , Maryvonne Dulmet

DOI: 10.1007/978-3-642-15961-9_40

关键词: Project managementDuration (project management)Context (language use)Process managementFunction (engineering)Product designOptimization problemTask (project management)Knowledge managementSimulated annealingEngineering

摘要: Product design projects involve multiple team members with various knowledge and competencies that have to evolve time, due rapid organizational, technological marketing changes. Project managers require management methods optimize the assignment of tasks human resources according their competency levels need for evolution. In this paper, we tackle optimization problem in context periods. The model propose seeks minimize two function objectives: (i) supplementary salary cost extended task duration when using under-competent employees (ii) financial penalties goals not been reached. This has solved by means a simulated annealing -based algorithm.

参考文章(17)
Erin L. Fitzpatrick, Ronald G. Askin, Forming effective worker teams with multi-functional skill requirements Computers & Industrial Engineering. ,vol. 48, pp. 593- 608 ,(2005) , 10.1016/J.CIE.2004.12.014
Walter J. Gutjahr, Stefan Katzensteiner, Peter Reiter, Christian Stummer, Michaela Denk, Competence-driven project portfolio selection, scheduling and staff assignment Central European Journal of Operations Research. ,vol. 16, pp. 281- 306 ,(2008) , 10.1007/S10100-008-0057-Z
Serpil Sayın, Selçuk Karabatı, Assigning cross-trained workers to departments: A two-stage optimization model to maximize utility and skill improvement European Journal of Operational Research. ,vol. 176, pp. 1643- 1658 ,(2007) , 10.1016/J.EJOR.2005.10.045
S. Kirkpatrick, C. D. Gelatt, M. P. Vecchi, Optimization by Simulated Annealing Science. ,vol. 220, pp. 671- 680 ,(1983) , 10.1126/SCIENCE.220.4598.671
Tzu-Liang (Bill) Tseng, Chun-Che Huang, How-Wei Chu, Roger R. Gung, Novel approach to multi-functional project team formation International Journal of Project Management. ,vol. 22, pp. 147- 159 ,(2004) , 10.1016/S0263-7863(03)00058-9
John W. Fowler, Pornsarun Wirojanagud, Esma S. Gel, Heuristics for workforce planning with worker differences European Journal of Operational Research. ,vol. 190, pp. 724- 740 ,(2008) , 10.1016/J.EJOR.2007.06.038
Xavier Boucher, Eric Bonjour, Bernard Grabot, Formalisation and use of competencies for industrial performance optimisation: A survey Computers in Industry. ,vol. 58, pp. 98- 117 ,(2007) , 10.1016/J.COMPIND.2006.09.004
Gaétan Caron, Pierri Hansen, Brigitte Jaumard, The Assignment Problem with Seniority and Job Priority Constraints Operations Research. ,vol. 47, pp. 449- 453 ,(1999) , 10.1287/OPRE.47.3.449
B Suman, P Kumar, A survey of simulated annealing as a tool for single and multiobjective optimization Journal of the Operational Research Society. ,vol. 57, pp. 1143- 1160 ,(2006) , 10.1057/PALGRAVE.JORS.2602068
Onanong Hlaoittinun, Eric Bonjour, Maryvonne Dulmet, A multidisciplinary team building method based on competency modelling in design project management international journal of management science and engineering management. ,vol. 3, pp. 163- 175 ,(2008) , 10.1080/17509653.2008.10671044