Production and removal of free-flowing coke from delayed coker drum

作者: Michael Siskin , Christopher P. Eppig , Te-Hung Chen , Steven W. Sparks

DOI:

关键词: Waste managementDrumDelayed cokerCoker unitSteamingMetallurgyCokeVolume percentMaterials scienceCompletion (oil and gas wells)

摘要: A method for producing and removing coke which has bulk morphology such that at least 30 volume percent is free-flowing under the force of gravity or hydrostatic forces from a delayed coker drum. At completion fill cycle, drum, filled with hot coke, cooled by steaming then flooding it water, thereby coke/water mixture. The mixture released drum through one more closure/discharge throttling systems near bottom

参考文章(64)
Youdong Tong, Michael K. Poindexter, Tom C. Rowe, Process for the inhibition of coke formation in pyrolysis furnaces ,(1996)
June M. Bostich, Wen-Ching Hsieh, Jeffery W. Koepke, Process for producing petroleum sulfonates ,(1988)
Glenn A. Clausen, Christopher A. Paul, Delayed coking of used lubricating oil ,(1991)
David L. Edmonds, Edward T. Dillon, Method for controlling foaming in delayed coking processes ,(1985)
C Crawley, W Schlinger, H Kaufman, Manufacture of petroleum coke ,(1972)
Kenji Suzuki, Junichi Kubo, Method for hydrocracking heavy fraction oil ,(1988)
Harry R. Janssen, Gary L. Poffenbarger, Method of reducing coke yield ,(1983)
Alice Dupatrocinio, Jose Guitian, Ramon Salazar, Monsaris Pimentel, Jose Cordova, Pedro Pereira, Oil soluble coking additive ,(2000)