STC power for 15 MW of PV comparing nameplate, initial power and power after 4 years

作者: Miguel García , Luis Marroyo , Eduardo Lorenzo , Javier Marcos , Miguel Pérez

DOI: 10.1002/PIP.2258

关键词:

摘要: To date, the majority of quality controls performed at PV plants are based on measurement a small sample individual modules. Consequently, there is very little representative data real Standard Test Conditions (STC) power output values for generators. This paper presents more than 1300 generators having total installed capacity almost 15.3 MW. The were obtained by INGEPER-UPNA group, in collaboration with IES-UPM, through study to monitor number from 2006 2009. work has made it possible determine, amongst other things, dispersion that can be expected different manufacturers, same manufacturer but comprising modules nameplate ratings and also formed characteristics. analyses STC evolution over time course this 4-year study. presented here could considered fault-free Copyright © 2012 John Wiley & Sons, Ltd.

参考文章(13)
H. Ossenbrink, Anne Drainer, W. Zaaiman, Errors in Current-Voltage Measurements of Photovoltaic Devices Introduced by Flash Simulators Springer Netherlands. pp. 1055- 1057 ,(1991) , 10.1007/978-94-011-3622-8_270
M.C. Alonso-García, F. Chenlo, Muñoz-García, Early degradation of PV modules and guaranty conditions world conference on photovoltaic energy conversion. pp. 3565- 3568 ,(2009) , 10.4229/24THEUPVSEC2009-4AV.3.77
N. Vela, M. Alonso-Abella, F. Fabero, J.P. Silva, F. Chenlo, PV Module Peak Power: Comparison Between Manufacturer Data and Laboratory Results 23rd European Photovoltaic Solar Energy Conference and Exhibition, 1-5 September 2008, Valencia, Spain. pp. 2837- 2840 ,(2008) , 10.4229/23RDEUPVSEC2008-4AV.3.21
Miguel Angel Muñoz-García, José Pedro Silva, Faustino Chenlo, None, Influence of initial power stabilization over PV modules maximum power world conference on photovoltaic energy conversion. pp. 3464- 3467 ,(2009) , 10.4229/24THEUPVSEC2009-4AV.3.50
S. Kaplanis, E. Kaplani, Energy performance and degradation over 20 years performance of BP c-Si PV modules Simulation Modelling Practice and Theory. ,vol. 19, pp. 1201- 1211 ,(2011) , 10.1016/J.SIMPAT.2010.07.009
Miguel García, Jose A. Vera, Luis Marroyo, Eduardo Lorenzo, Miguel Pérez, Solar-tracking PV plants in Navarra: A 10 MW assessment Progress in Photovoltaics. ,vol. 17, pp. 337- 346 ,(2009) , 10.1002/PIP.893
A. Virtuani, H. Müllejans, E. D. Dunlop, Comparison of indoor and outdoor performance measurements of recent commercially available solar modules Progress in Photovoltaics: Research and Applications. ,vol. 19, pp. 11- 20 ,(2011) , 10.1002/PIP.977
F. Martínez-Moreno, E. Lorenzo, J. Muñoz, R. Moretón, On the testing of large PV arrays Progress in Photovoltaics. ,vol. 20, pp. 100- 105 ,(2012) , 10.1002/PIP.1102
J. Muñoz, E. Lorenzo, F. Martínez-Moreno, L. Marroyo, M. García, An Investigation into Hot-Spots in Two Large Grid-Connected PV Plants Progress in Photovoltaics. ,vol. 16, pp. 693- 701 ,(2008) , 10.1002/PIP.844
E.D. Dunlop, Lifetime performance of crystalline silicon PV modules 3rd World Conference onPhotovoltaic Energy Conversion, 2003. Proceedings of. ,vol. 3, pp. 2927- 2930 ,(2003)