作者: A. Göschel , A. Sterzing , J. Schönherr
DOI: 10.1016/J.CIRPJ.2011.06.018
关键词:
摘要: Abstract In the 21st century design of energy efficient processes and process chains has become an important research field in production engineering. To meet needs for sustainable chains, evaluation methods standards as well planning tools have to be developed. this paper, a new procedure material balancing, called PEMB, is introduced. On basis investigated or chain method leads into related balance. Using key figures such efficiency which are integral part introduced regarded can carried out. example press hardening PEMB explained detail validated. The calculation balance cutting resulted 67% showed saving potential by reducing residual material, cycle time basic load press. applied terms retrospective improvement prospective resource chains.