作者: SN Singh , AK David
DOI: 10.1049/CP:20000386
关键词:
摘要: The ongoing power system restructuring requires an opening of unused potentials transmission systems due to environmental, right-of-way and cost problems which are major hurdles for network expansion. FACTS devices can be alternative reduce the flows in heavily loaded lines, resulting increased loadability, low loss, improved stability network, reduced production fulfilled contractual requirement by controlling network. This paper suggests, first, few optimal locations then determines best location order along with device cost. allocation also discussed. effectiveness purposed methods is demonstrated on IEEE 14-bus system.