作者: Conor Lewellyn , Cara E. Lyons , Robert G. Traver , Bridget M. Wadzuk
DOI: 10.1061/(ASCE)HE.1943-5584.0001257
关键词:
摘要: AbstractGreen infrastructure, including stormwater control measures (SCMs), meant to reduce runoff volumes are typically designed for smaller, frequently occurring events (e.g., 2.5 cm or the 2-year, 24 h event), and their performance not always considered larger, more infrequent extreme event management. However, even during larger rainfall events, a SCM is still capturing at least design reducing volume. Further, if relies on infiltration as its primary volume reduction strategy, continues throughout indicating that SCMs can be in flood mitigation strategies. This phenomenon of greater than removal has been noted several infiltrating SCMs, present work uses Villanova green infrastructure site comprising an trench with pretreatment (i.e., linear vegetated SCMs) basis discussion. The analysis focuses v...